4-Berth Camper Roof tent - image 1
4-Berth Camper Roof tent - image 2
4-Berth Camper Roof tent - image 3
4-Berth Camper Roof tent - image 4
4-Berth Camper Roof tent - image 5
4-Berth Camper Roof tent - image 6
4-Berth Camper Roof tent - image 7
RLC103200Keine Buchungsgebühr
verfügbar

4-Berth Camper Roof tent

A

Perth

Western Australia

B

Adelaide

South Australia

Reisedetails

Our outstanding campervan gives you a compact vehicle to drive and park, no matter where you are. Even in Sydney’s tightly cramped parking spaces!

When you park at your campground for the night, it takes a quick one-minute to unlock your penthouse bed and, voila, you have a second bedroom and double your living space. This 4-Berth Campercar also has a kitchen in the back.

Key features

  • Sleeps 4
  • Curtains for all windows
  • Portable gas cooker
  • 18-litre fridge
  • Sink with tap and drain
  • 10-litre water tank

Included with the vehicle

  • Duvet, pillows, and sheets
  • Airport shuttle transfers
  • 24/7 roadside assistance
  • Unlimited kilometres
  • Bucket and cleaning equipment
  • All cutlery and dinnerware
  • Towels and tea towel

Fahrzeuginformationen

Spezifikationen

🚗 Toyota Estima
📆 <20 Jahre alt
⚙️ Automatisch
⛽️ Benzin Motor
💺 4 Sitze
🛏️ Plätze 4

Ausstattungen

Küche
Dusche & Toilette
Eigenständig
Heizung

Diese Relocation buchen

Jetzt buchen

Teilen

Relocation-Tarif
A$1.00 / Tag
A$70.00 / Tag
A$3,000.00

Weitere Informationen

Für weitere Informationen zu den Kosten besuchen Sie bitte unserBlogbeitrag.

Was unsere Reisenden sagen

Tausende zufriedene Kunden haben mit Imoova bei ihren Roadtrips gespart.

"Such an amazing way to travel! We picked up a campervan for just $1/day and had the most incredible road trip along the coast. The booking process was seamless and the vehicle was in great condition."

SM

Sarah M.

Sydney to Melbourne

"We've done three relocations with Imoova now and each one has been fantastic. It's honestly the best-kept secret for budget travel in New Zealand. We saved thousands compared to a regular rental."

JL

James & Lily T.

Auckland to Christchurch

"Couldn't believe how cheap it was to rent a car one-way. The whole experience from booking to drop-off was smooth. Will definitely be checking Imoova first for all my future road trips."

MW

Marcus W.

Los Angeles to Las Vegas

"A friend recommended Imoova and we're so glad they did. We drove a motorhome up the Queensland coast for next to nothing. The kids loved it and we made memories that will last a lifetime."

ET

Emma & Tom R.

Brisbane to Cairns

"Great value for money. The vehicle was clean and well-maintained. Only minor hiccup was the pickup took a bit longer than expected, but the staff were friendly and helpful throughout."

DK

David K.

Vancouver to Calgary

"Relocating a campervan across Europe for almost nothing was a dream come true. We took our time, stopped at incredible places along the way, and it cost less than a single night in a hotel!"

AP

Anika P.

Munich to Barcelona

Aus dem Blog

Ihr Leitfaden für Fahrzeugumzüge, Planung von Roadtrips und Reiseplänen für jeden, von Rucksackreisenden bis zu Familien.